Thành tích thực tế về thiết bị       

Rào chặn rác kiểu quay

NameTraveling Band Screen REFERENCE LIST H plus R environmental eng'g co.,Ltd
YearPlantAplicationFlow typeMechnical length (mm)Distannce between axes (mm)Mesh width & opening (mm)No.of basketsCapacity (CMH)Qlt'yMaterial-screeningChamber Width x Depth (M)Remark
2016CABRAS Unit No.2 Traveling Screen Replacement in GuamSeawater Intake SystemThru flow2,4004,8802d x 9.5226,8132AISI 316L2.438 x 5.03Guam
2015Lin Kou Power Station Rewal Unit 1~3Seawater Intake SystemCentral flow2,50013,5001.2d x 67050,4009AISI 316L7.5 x 15.45TWN
2014CABRAS Unit No.1 Traveling Screen Replacement in GuamSeawater Intake SystemThru flow2,4004,8802d x 9.5226,8132AISI 316L2.438 x 5.03Guam
2013Kimanis 300MW Conbined cycle power plant project in MalaysiaSeawater Intake SystemCentral flow1,6009,0001.2d x 74417,1004AISI 316L2.9 x 9.8Malaysia
2010Taiwan Fertilizer Company Taichung plant Project Seawater Intake screen systemSeawater Intake SystemCentral flow1,20010,5001.0d x 45010,0002AISI 316L2.8 x 11.5TWN
2007Northern LNG Receiving TerminalSeawater Intake SystemCentral flow1,60011,0001.2d x 7.45217,0002AISI 316L2.8 x 11.08TWN
2007Mazu Zhushan Power Station Unit 1~2Seawater Intake SystemCentral flow1,60011,0001.0d x 4527,2002AISI 316L2.8 x 11.9TWN
2007Da Tun Power Plant Combined Cycle Units 1~6Seawater Intake SystemCentral flow2,50012,0001.2d x 66048,00012AISI 316L5.3 x 13.3TWN
2003Lungmen Project 4th Nuclear Power Plant Units 1&2Seawater Intake SystemCentral flow3,00012,3652.0d x 106677,24012AISI 316L7.4 x 15TWN
2002Hsieh Ho Power Station Unit 2Seawater Intake SystemCentral flow1,6007,5002.0d x 104226,8203AISI 316L4.2 x 8.4TWN
2002Hsieh Ho Power Station Unit 3Seawater Intake SystemCentral flow1,6007,5002.0d x 104226,8203AISI 316L4.2 x 8.4TWN
2001Hsin Ta Power Station Unit 1Seawater Intake SystemCentral flow1,6008,0001.2d x 64426,8203AISI 316L4.2 x 9.1TWN
2001Hsin Ta Power Station Unit 2Seawater Intake SystemCentral flow1,6008,0001.2d x 64426,8203AISI 316L4.2 x 9.1TWN
2000Jinmen Shuitoushan Power Station Unit 1~4Seawater Intake SystemCentral flow1,60011,0001.0d x 4527,2002AISI 316L2.8 x 11.9TWN
2000Southern LNG Receiving Terminal (3rd)Seawater Intake SystemCentral flow1,6008,0001.0d x 7.44420,0002AISI 316L4.0 x 9.65TWN
1999Da Lin Power Station Unit 1Seawater Intake SystemCentral flow1,6007,5001.2d x 64226,8203AISI 316L4.2 x 8.4TWN
1999Da Lin Power Station Unit 2Seawater Intake SystemCentral flow1,6007,5001.2d x 64228,0002AISI 316L4.2 x 8.4TWN
1999Penghu Jianshan Power Station Unit 1~4Seawater Intake SystemCentral flow1,60011,0001.0d x 45212,9602AISI 316L2.8 x 12.08TWN
1998Da Lin Power Station Unit 3Seawater Intake SystemCentral flow1,6007,5001.2d x 64226,8203AISI 316L4.2 x 8.4TWN
1998Da Lin Power Station Unit 4Seawater Intake SystemCentral flow1,6007,5001.2d x 64228,0002AISI 316L4.2 x 8.4TWN
1997Da Lin Power Station Unit 5Seawater Intake SystemCentral flow1,6007,5001.2d x 64226,8203AISI 316L4.2 x 8.4TWN
1996Hsin Ta Combined Cycle Units 1~5Seawater Intake SystemCentral flow1,6007,5001.2d x 64421,60010AISI 316L5.2 x 9.0TWN
1994Tai Chung Power Station Units 5~8Seawater Intake SystemCentral flow2,00011,5001.2d x 65839,61012AISI 316L5.2 x 12TWN
1990Tai Chung Power Station Units 1~4Seawater Intake SystemThru flow4,30011,2852.0d x 104335,82012AISI 3044.3 x 12TWN

Thành tích thực tế về thiết bị

Rào chặn rác kiểu quay