Theory>> (Refer. Dwg. 2)
The screening function of traveling band screen is provided by its endless semi-circular baskets, the baskets were fixed on two chain strips. The debris will be retained on baskets when the water passes through the screen. The water level differential will be increased along with the debris accumulation on baskets. As the water level differential reached the preset value, the driving system will be switched on automatically to rotate the baskets upward. The debris will be fallen down to debris trough by gravity and spray water will clean the baskets when basket reached the top of chain strip. The water level differential will be reduced when the clean baskets submerged into water again. The driving system will be switched off when the water level differential reduced to preset value and the screening cycle completed. (Refer. Dwg. 2)
Basic Specification>>
a. The screening mesh can be varied from 0.1 to 10 mm
b. The rotation speed can be constant, dual speed or tri-speed per requirement of operation condition.
c. Mechanical overload protection is provided.
d. Chain slack detector and alarm system were provided.
e. The intake channel width can be varied from 2.5 to 10 M.
Single or dual spray pipes can be selected per inlet S.S condition.
f. The designed water differential head can be varied from 0.5 to 3 M.
g.Chain pitch is 500 mm, water lubrication type.
Feature>>
1. Influent and clean water were isolated in two sides of screen meshes, no carry over concerns of debris. (Refer. Dwg. 2)
2. No submerged sprockets, easy maintenance.
3. Water lubrication chain, maintenance free.
4. Unique suspension and shock absorption system of driving unit.
5. Semi-circular basket design (Refer. Dwg. 3)
a.High debris retaining volume, increased screening efficiency.
b.High durability.
c.Easy dismantle and assembly, no special tool required.
6. Debris vertical gravity discharge
a. Less pressure and flow rate of spray water, low initial and operation cost.
b. Can be operated without spray water, no debris carry over concern.
Specification>> (Refer to Dwg. 4~5 & Table.1)